Saturday 30 March 2013

Paint and fit-outs

Our house has received its first coat of paints and the electrical fit-outs are 99% complete. Toilets and basins have also been installed.

Main bedroom

Eave edges painted

 Outdoor light

Can see our alarm panel

View from back lounge

Kitchen (rangehood installed too)

Hot water system

Benchtop (unsure of colours now that we've seen it)

Kitchen Downlights (window reflection ruining image)

Power point and network point

Kitchen sink

Where the NBN will live

Tuesday 19 March 2013

Tiling

Visited after a week holiday to find tiling has been completed in our laundry, bathrooms and front porch. Hallway, back lounge and kitchen to go.

En-suite floor and vanity

En-suite shower

Close-up of en-suite cabinet

Laundry step

Garage step

Bathroom

Bathroom shower with recess in wall

Bathtub

Laundry

Close-up of kitchen drawers

Saturday 9 March 2013

Kitchen, bathrooms and garage door

Our kitchen cabinets have been installed. As well as this, both our bathrooms have had their cabinets and vanities completed. Also a nice surprise to see our garage door has also arrived and been put in place.

Next week our tiling begins...














Tuesday 5 March 2013

Water proofing completed and Rainwater tank installed

Looks like we're progressing nicely. Our waterproofing looks completed (from what I could see through the windows), and our rainwater tank is now there. Plan for the rest of the week is to have the kitchen installed, so it looks like we're on track.