Saturday 30 March 2013

Paint and fit-outs

Our house has received its first coat of paints and the electrical fit-outs are 99% complete. Toilets and basins have also been installed.

Main bedroom

Eave edges painted

 Outdoor light

Can see our alarm panel

View from back lounge

Kitchen (rangehood installed too)

Hot water system

Benchtop (unsure of colours now that we've seen it)

Kitchen Downlights (window reflection ruining image)

Power point and network point

Kitchen sink

Where the NBN will live

No comments:

Post a Comment